Hot work permit
A hot work permit is a written authorisation to do welding, gas cutting, grinding or other spark or flame work, issued only after the area is checked for fire risk.
What it means
Sparks can travel several metres and ignite oil, paper, packaging or vapours that nobody noticed. The permit forces a check before work: flammables moved or covered, floor and gaps swept, an extinguisher at hand, a watcher assigned and gas tested where vapour may exist. It sets a time limit, and the watcher stays afterwards to look for smouldering.
Example
A contractor has to weld a rack in a packaging godown. The safety officer clears cartons for ten metres, places a powder extinguisher, posts a watcher and signs the permit for two hours.
Records and checks
- Record the location, work, time limits, precautions, the issuer, the worker, the watcher and the closing time.
- Verify the area before work and again after the watch period.
- The safety officer issues and closes it, and the watcher stays at the spot throughout.
Common mistakes
- Letting a contractor weld "just a minute" with no permit when the job looks small.
- Leaving as soon as the sparks stop, so a smouldering pile is found hours later.