Incident investigation
An incident investigation is the structured effort to establish what happened, the sequence of events and the underlying causes of an accident, injury, damage or near miss.
What it means
The aim is to find causes, not to blame a person. Investigators visit the spot early, preserve evidence such as the machine state and tools, take statements, and ask why repeatedly until they reach a cause the business can control, such as a missing guard, poor training or a rushed schedule.
Example
A forklift tips over in a Coimbatore warehouse while carrying ₹3 lakh of stock. The team finds the floor had a broken patch, the driver was on his second shift in a row, and the load was stacked too high. Three actions follow, each with an owner.
Records and checks
- Record the date, place, people involved, photographs, sketches and the timeline of events.
- Verify that the stated causes are backed by evidence, not by guesses.
- A manager outside the affected team should review the findings and the action list.
Common mistakes
- Stopping at "worker was careless" instead of asking what allowed the error.
- Waiting several days to visit the spot, by which time the scene has been cleaned up.