Incident report
An incident report is the written first record of an event that caused or could have caused injury, damage or loss, made by the person who saw or handled it.
What it means
It is the starting document of the whole safety trail. It captures the facts while memory is fresh: date, time, location, people hurt or present, a plain description, the first aid or help given, and who was told. It does not conclude on cause; that belongs to the investigation.
Example
A helper at a textile mill in Surat gets a cut from a loose blade at 3:40 pm. The line supervisor fills the report within the shift, notes the first aid given, and sends it to the safety officer the same evening.
Records and checks
- Record time, place, injured person, witnesses, equipment involved and immediate action taken.
- Verify the report matches the first aid register and the attendance record.
- The safety officer or HR reviews every report within a fixed number of days.
Common mistakes
- Writing the report days later from memory, with the details blurred.
- Leaving out near misses because nobody was hurt.
Check the current rule on the official portal or with your CA before acting.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →