Incoming quality control
Incoming quality control is the inspection of materials and components received from suppliers before they are accepted into stock or issued to production.
What it means
Goods are checked against the purchase order and specification at the gate or stores. Checks may include quantity, visual condition, dimensions, test certificates and sample tests. Items that pass are released to stock; failures are held, marked and sent for a decision, such as return, rework or use under concession. The depth of checking depends on the item's risk and the supplier's record.
Example
A cable maker receives 2 tonnes of copper rod. The lab checks diameter and conductivity on samples and compares the mill certificate. Conductivity is below the specification, so the lot is tagged "hold", the supplier is informed, and the material is returned, avoiding a batch of finished cable that would have failed tests.
Records and checks
- Record the supplier, the lot, the checks done, results and the accept or reject decision.
- Verify that rejected items are physically separated and labelled.
- The quality inspector decides, and the stores head will not issue unreleased material.
Common mistakes
- Letting production draw material before inspection is finished because of urgency.
- Checking only quantity and leaving specifications unchecked.