lamp.
ResourcesPricingAbout

Injection moulding

Injection moulding is a process that melts plastic and injects it under pressure into a closed mould, where it cools and hardens into the shape of the part.

What it means

Granules are fed into a heated barrel, melted by a screw and pushed into a mould clamped shut. The plastic cools, the mould opens and the part is ejected, and the cycle repeats every few seconds to a minute. The process suits large volumes of detailed parts such as caps, crates, housings and toys, but needs a costly mould and careful control of temperature, pressure and time.

Example

A Mumbai moulder makes 5 lakh polypropylene caps a month on a 150-tonne machine with an 8-cavity mould. Each cycle is 20 seconds, so a shot gives eight caps and the machine yields about 1,440 caps an hour, with regrind and rejects tracked on a shift sheet.

Records and checks

  • Record the machine, mould, material grade, key settings, cycle time, good output and rejects for each shift.
  • Verify the first article against the drawing and then check weights and dimensions at set intervals.
  • The setter approves the setup, the quality inspector samples the parts, and the production head reviews scrap and downtime.

Common mistakes

  • Running jobs without a documented setting, so every setter finds the process again.
  • Ignoring mould maintenance until flash or sticking forces a breakdown.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →