Injection pressure
Injection pressure is the pressure used to push molten plastic into the mould cavity during the filling stage of the cycle.
What it means
It is the force needed to move melt through the nozzle, runner and gate and fill the cavity. The pressure required depends on the melt temperature, the thickness of the part, the flow length and the gate size. Pressure that is too low gives short shots. Pressure that is too high gives flash and wear. In practice, setters use the lowest pressure that fills the part well.
Example
A long, thin tray needs 95 bar to fill completely at the present melt temperature. A setter tries 80 bar and gets short shots at the far corner, then 110 bar and sees flash at the parting line. The approved setting of 98 bar is written on the setup sheet.
Records and checks
- Record the injection pressure, the injection speed, the melt temperature and the machine and mould used.
- Verify that parts fill fully and have no flash at the recorded pressure, and that the machine has headroom above it.
- The setter finds the setting, the operator holds it, and the quality inspector confirms with first article and hourly checks.
Common mistakes
- Fixing every short shot with more pressure instead of checking temperature and venting.
- Running close to the machine's pressure limit, which leaves no room for material changes.