Inspection checklist

An inspection checklist is a list of specific points to check, in a set order, with room to mark each as pass or fail.

What it means

It turns an inspector's memory into a written routine. Each line names one thing to check, how to check it and what counts as acceptable. Because everyone follows the same list, results can be compared between people and shifts, and a new inspector can do a reliable job in the first week. Checklists can cover a product, a vehicle, a machine or a premises.

Example

Before dispatching a water pump, the final checker works through a list of 12 points: nameplate data, direction of rotation, leakage at 3 bar, motor current, paint finish, and packing. One line fails, the nameplate shows the wrong rating, so the pump goes back to be relabelled.

Records and checks

  • Record the date, product or lot, inspector, every line result and any remark.
  • Verify that the checklist matches the current drawing and customer requirement.
  • The quality head reviews the list after any complaint and updates it.

Common mistakes

  • Ticking all boxes from habit without measuring or looking.
  • Never adding new points after a defect escapes to a customer.