lamp.
ResourcesPricingAbout

Inspection plan

An inspection plan is a document that sets out what is to be inspected on a product, using which method and gauge, how often and against what limits.

What it means

It is the quality department's instruction for a particular item. Each line names a characteristic from the drawing, the gauge or test, the sample quantity, the stage of inspection and the acceptance limit. Operators and inspectors work from it, and customers may ask to see it. It differs from a checklist in being specific to a part and in stating sample size and frequency.

Example

For a hydraulic fitting, the plan lists thread gauge on every piece at final stage, wall thickness by micrometer on five pieces each hour, and a pressure test on one piece per lot at 250 bar. The inspector follows these and records each result against the lot number.

Records and checks

  • Record the characteristic, specification, gauge, sample size, frequency and the person responsible.
  • Verify that each plan matches the current drawing revision.
  • The quality engineer writes it, and the quality head approves it.

Common mistakes

  • Letting an old drawing revision stay in the plan after the customer changes the part.
  • Specifying a gauge that cannot read the tolerance required.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →