lamp.
ResourcesPricingAbout

Invoice tolerance

Invoice tolerance is the agreed small difference in price or quantity between a supplier invoice and the order or receipt that is accepted without raising a query.

What it means

Real deliveries rarely match to the last paisa or the last unit. A tolerance sets how far a bill may drift, as a rupee amount, a percentage or both, before it needs a human to look at it. Bills inside the limit pass straight to payment; bills outside it are held. A sensible limit saves time without letting repeated small overbilling slip through.

Example

A trader sets tolerance at 2% or ₹500, whichever is lower, per invoice line. A bill for ₹24,300 against an order of ₹24,000 is within range and is cleared, while a bill for ₹26,000 is held for the buyer to check.

Records and checks

  • Record the tolerance rule, who approved it and the date it was last reviewed.
  • Verify each quarter what was cleared under tolerance, by supplier, to spot overbilling.
  • The finance head signs off any change to the limit.

Common mistakes

  • Setting a high flat percentage on large bills, so a ₹50,000 overcharge passes unnoticed.
  • Never reviewing the limit, so one supplier quietly bills the maximum every time.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →