Job completion proof
Job completion proof is the evidence collected at the end of a service visit, such as a customer signature, photographs and a closing note, showing the work was done.
What it means
Service firms use it to settle disputes, release technician payments and raise invoices with confidence. Typical items are before and after photos, the customer's signature or one-time code, readings from the repaired equipment and a list of parts replaced. Without it, a customer can later claim that nobody came or the fault returned the same day.
Example
An elevator maintenance technician photographs the old worn-out belt and the new one, records the test run, and gets the building manager's signature on the visit sheet. A month later, when the manager disputes the ₹8,500 charge, the firm shares these records.
Records and checks
- Record the job number, date, time in and out, photos, signature or code, readings and parts replaced.
- Verify that photos show the correct site and asset, and that the signer is authorised.
- The technician captures the proof and the supervisor reviews it before the invoice is raised.
Common mistakes
- Collecting the signature on a blank form before the work is finished.
- Taking photos that do not show the asset's serial number or the location.