lamp.
ResourcesPricingAbout

Kilowatt hour

A kilowatt hour is the energy used when a 1 kilowatt load runs for one hour, and it is the unit your electricity bill is based on.

What it means

It is the "unit" in "₹8 a unit". To find energy used, multiply the power in kilowatts by the hours of running. A 3 kW machine running for 4 hours uses 12 kilowatt hours. Because it combines power and time, it lets you compare very different machines on one scale, and to cost a product by the power it takes to make it.

Example

A bakery oven rated 12 kW is on for 5 hours a day for 26 days a month at about 70 percent of its rating. Energy is 12 times 5 times 26 times 0.7, about 1,092 kilowatt hours, costing about ₹8,700 at ₹8 a unit.

Records and checks

  • Record meter readings with date and time, and the production or hours they relate to.
  • Verify monthly totals against the utility's bill and sub meter sums.
  • The accountant converts units to rupees and the plant head explains large swings.

Common mistakes

  • Using the machine's rating as the energy it consumed, ignoring part load running.
  • Comparing months of different length without adjusting.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →