lamp.
ResourcesPricingAbout

Kitchen production sheet

A kitchen production sheet is a list of the preparations, gravies, doughs, cut vegetables and sauces a kitchen must make before service, with the quantity for each.

What it means

Unlike a menu, it covers the building blocks that cooks need ready on the line. Quantities follow forecast covers and each recipe's yield, and the sheet shows who prepares each item and by what time. A kitchen supplying many outlets uses it to plan batch size. After service, the leftover quantity is noted to improve the next forecast.

Example

A hotel kitchen expects 150 covers at dinner. The sheet lists 12 litres of tomato gravy, 8 kg of marinated chicken and 6 kg of chopped onion, each with a cook's name. At close, 2 litres of gravy remain and the next forecast is lowered.

Records and checks

  • Record the item, forecast quantity, quantity prepared, cook, preparation time and leftover.
  • Verify quantities against the recipe yield and the forecast covers.
  • The sous chef signs off the sheet before service and the head chef reviews leftover each week.

Common mistakes

  • Preparing to a fixed quantity each day without looking at bookings.
  • Ignoring leftover, so over-preparation continues unnoticed.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →