kWh
kWh is the symbol for kilowatt hour, the unit of electrical energy used in bills, meters and energy reports, equal to one unit of power.
What it means
Everywhere a meter or bill says "units", it means kWh. Dividing kWh by output, such as per tonne or per thousand pieces, gives a figure that tells you whether the process is becoming more or less efficient. Raw kWh totals can rise simply because production rose, so on their own they do not show waste. Readings must be taken at the same time each period for comparisons to hold.
Example
A foundry in Belagavi uses 48,000 kWh in a month while pouring 120 tonnes of castings. That is 400 kWh per tonne. Next month, with 150 tonnes poured, it uses 54,000 kWh, or 360 kWh per tonne, a real improvement.
Records and checks
- Record the meter reading, the date and time, and the output of the same period.
- Verify kWh totals from sub meters add up to the main meter within a small tolerance.
- The plant accountant reports kWh per unit of output monthly to the owner.
Common mistakes
- Judging efficiency from the bill total instead of per unit of output.
- Mixing readings taken on different days in one comparison.