Laser cutting

Laser cutting is a thermal process that melts or vaporises metal along a programmed path using a focused laser beam, giving narrow cuts and clean edges on sheet and thin plate.

What it means

The cutting head follows a file drawn from the part drawing, while an assist gas such as oxygen or nitrogen clears the molten metal. Nitrogen gives a clean edge on stainless steel. Thick plate is usually cut by plasma for cost.

Example

A fabricator sends a drawing for 400 brackets in 3 mm mild steel to a job-work laser shop. The shop nests them on a 2500 x 1250 mm sheet, charges per cutting minute plus material, and returns burr-free parts ready for bending.

Records and checks

  • Record the material grade, thickness, assist gas, nesting file, sheet used and cutting time.
  • Verify the first part's dimensions and hole sizes against the drawing before the full run.
  • The programmer checks the file, and the incoming inspector checks the delivered lot.

Common mistakes

  • Sending a drawing without stating material grade, so the shop assumes a different one and the edge quality or price changes.
  • Ignoring edge hardening on oxygen cuts when the part will be tapped or welded.