Load factor
Load factor is the share of a vehicle's capacity actually used on a trip, shown as a percentage of the weight or volume it could have carried.
What it means
A truck that leaves half empty costs almost as much to run as a full one, so a low load factor pushes up cost per kilogram moved. It can be measured by weight, by volume or by pallet positions; use whichever limit the goods reach first. Owners track it route by route to decide whether to consolidate orders.
Example
A 9-tonne truck carries 5.4 tonnes of cement bags from the plant to a dealer. The load factor is 60 per cent, and combining with a second dealer's order would raise it to 90 per cent.
Records and checks
- Record loaded weight or volume and the vehicle's capacity for each trip.
- Verify the figures against weighbridge or loading records, not estimates.
- The dispatch planner calculates monthly averages; the owner reviews routes with persistently low figures.
Common mistakes
- Measuring by weight only for bulky, light goods that fill the vehicle by space.
- Chasing a 100 per cent load factor and delaying customer orders just to fill a truck.