Lorry receipt
A lorry receipt is the document a road transporter issues when it accepts goods, recording parties, packages, weight, vehicle and freight terms. It is also called a bilty.
What it means
It acts as a receipt for the goods and as evidence of the transport contract. The consignor sends or shows it to the consignee, who usually needs it to collect delivery. Transporters number LRs serially, and the number appears in claims, freight bills and delivery proof.
Example
A stationery wholesaler books 30 cartons with a transporter in Delhi for a retailer in Lucknow. LR number 7712 records 30 cartons, 360 kg and the vehicle number, and the retailer shows it at the destination godown to receive goods.
Records and checks
- Record LR number, date, transporter, vehicle number, packages and freight against the invoice.
- Verify the LR details against the invoice and the actual load before the vehicle leaves.
- The dispatch clerk files the LR copy; accounts matches it to the transporter's bill.
Common mistakes
- Accepting an LR without invoice number, so the shipment cannot be linked later.
- Paying a transport bill without an LR or signed delivery proof for each trip.
Check the current rule on the official portal or with your CA before acting.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →