Machine energy cost

Machine energy cost is the electricity cost of running one machine for a period or a job, equal to its kWh used multiplied by the rate per unit.

What it means

It helps price jobs and spot machines that cost too much to run. The best way is a sub meter on the machine; the second best is to measure its running current and calculate power. The cost per job is then energy cost divided by the pieces made. Machines that idle with power on, such as a compressor or heater left on between jobs, show up as high energy cost per piece.

Example

A CNC machine in Rajkot draws about 6 kW while cutting, and ran for 160 hours in a month, using about 960 kWh. At ₹9 per unit the energy cost is ₹8,640. With 4,800 pieces made, that is ₹1.80 a piece.

Records and checks

  • Record kWh by machine, running hours, pieces made and the unit rate used.
  • Verify the machine figures against the main meter so total shop floor energy is explained.
  • The production manager reviews the highest cost machines monthly with the electrical supervisor.

Common mistakes

  • Using the motor rating as power drawn, which overstates cost.
  • Leaving machines on during breaks and shifts with no work.