Maintenance checklist
A maintenance checklist is a list of inspection and service steps for a machine, ticked off by the technician so that every item is done the same way each time.
What it means
It makes routine work repeatable. A good checklist is specific to the machine, uses short actions such as "check belt tension" or "grease bearings", and gives the expected value or standard where it matters. It is carried out daily by operators, weekly by technicians or at each major service. A completed checklist also becomes evidence that servicing happened.
Example
A compressor's weekly checklist has 12 items: oil level, drain moisture, belt condition, safety valve, pressure reading and so on. The technician notes a belt crack on item 3, and a replacement is raised the same day.
Records and checks
- Record the date, machine ID, each item's result, readings taken and the technician's name.
- Verify a sample of completed checklists against the machine, to see that ticks match reality.
- The technician fills it in; the maintenance supervisor reviews and signs.
Common mistakes
- Ticking everything quickly without looking, which turns the checklist into a formality.
- Keeping a generic list that does not fit the machine.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →