Maintenance request
A maintenance request is a formal report from an operator or supervisor describing a fault or need on a machine and asking maintenance to act.
What it means
It starts the repair process. A useful request names the machine, shows what is wrong, how urgent it is and whether it is safe to keep running. It is raised on a slip, in a register or by message, and then reviewed by maintenance, which decides priority and issues a work order. Requests also give a record of how problems are reported over time.
Example
An operator on the second shift writes: "Press 4, oil leak under ram, running but dripping about a cup an hour." The maintenance supervisor classes it as medium, and schedules the fix for the next morning.
Records and checks
- Record the date and time, machine ID, problem description, requester, urgency and the request number.
- Verify that each request is acknowledged, assigned and closed with a note of what was done.
- The operator raises it; the maintenance supervisor triages and the requester confirms the fix.
Common mistakes
- Verbal requests with no record, so work is forgotten or duplicated.
- Vague wording such as "machine problem", which wastes the technician's time.