Marker efficiency
Marker efficiency is the percentage of the marker's fabric area that is covered by pattern pieces, the remainder being cutting waste.
What it means
It equals the total area of all pieces in the marker divided by the marker's length times width, times 100. A marker at 85 percent wastes 15 percent of the fabric in gaps. Efficiency depends on the fit of shapes, the size mix, fabric width and any rule on grain or stripes. It is the single largest lever on fabric cost per garment.
Example
A 4.0 metre marker with 1.6 metre width has an area of 6.4 sq metres. Pieces cover 5.5 sq metres, giving 85.9 percent. A tighter marker at 88 percent on the same pieces saves about 2.4 percent of the fabric.
Records and checks
- Record marker number, length, width, piece area and efficiency.
- Verify the marker's piece count against the order ratio and style.
- The marker planner prepares it; the cutting head approves.
Common mistakes
- Chasing high efficiency by breaking grain rules that the buyer requires.
- Comparing markers of different widths as though they were equal.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →