Maximum stock level

Maximum stock level is the highest quantity of an item you allow yourself to hold, set so that purchases do not tie up too much cash or space.

What it means

It acts as a ceiling for purchasing. When a new order would push the balance above it, the buyer should cut the quantity or delay the order. A common way to set it is reorder level plus reorder quantity, minus the minimum usage during the lead time. Storage capacity, shelf life and cash available also matter.

Example

A paint shop sells about 60 litres of white primer a week. The reorder level is 150 litres, the standard order 200 litres, and the maximum 300 litres. At 180 litres in stock, the buyer takes only 120 of a 200-litre offer.

Records and checks

  • Record the maximum level per item with the storage limit and the basis of the figure.
  • Verify at receipt that the balance after delivery will not exceed it.
  • The purchase head reviews every case where stock went above the ceiling and asks why.

Common mistakes

  • Accepting a supplier's bulk offer without checking space or shelf life, then writing off spoiled stock.
  • Setting the ceiling once and never revising it when demand falls.