Measurement book

A measurement book is a bound, page-numbered register in which measured quantities of completed work are recorded and signed, forming the basis for paying a contractor.

What it means

It is a primary document for a construction contract. Each entry shows the item, location, dimensions, working and total, with the date. Using a bound, numbered book, rather than loose sheets, makes it harder to alter entries or insert pages. The running bill is prepared from the book, and any dispute about work done is settled by looking at the entry.

Example

A plumbing contractor lays 180 m of 50 mm pipe on a building's second floor. The engineer measures it on site, writes 180.0 m on page 47 with the room-wise breakup, and both sign. The contractor's bill quotes page 47.

Records and checks

  • Record: date, work item, location, dimensions, quantity, page and entry number, and signatures.
  • Verify: that page numbers run without gaps and entries are not overwritten, with corrections struck through and initialled.
  • Checked by: the measuring engineer signs; the project head reviews pages before bills are paid.

Common mistakes

  • Writing in pencil or on loose sheets, to be copied into the book later.
  • Measuring work that is not yet complete, which results in early payment.