MS plate

MS plate is flat mild steel in sheet form, normally thicker than about 3 mm, ordered by thickness, width and length and bought mostly by weight.

What it means

Fabricators use it for base plates, brackets, tanks, machine frames and gussets. Plates come in standard sizes, such as 2500 x 1250 mm or are cut to order for a fee. The weight is calculated from the dimensions and the density of steel.

Example

A fabricator needs 20 base plates of 300 x 300 x 12 mm. Each weighs about 8.5 kg, so the order is 170 kg. At a rate of ₹62 per kg, the plates cost roughly ₹10,500, before cutting charges.

Records and checks

  • Record the thickness, size, quantity, weight, heat number and supplier invoice number.
  • Verify the thickness with a micrometer or caliper at receipt, and the weight against the supplier's weighment slip.
  • The store keeper checks and the purchase head approves the supplier invoice.

Common mistakes

  • Accepting a thinner plate within a rolling tolerance but paying for the nominal weight.
  • Not marking offcuts with grade and heat number, so they cannot be reused on certified jobs.