MTBF
MTBF stands for mean time between failures: the average running time between consecutive breakdowns of a repairable machine or system.
What it means
MTBF shows how dependable a machine is. The simple way to calculate it is total running hours divided by number of failures in the period. Maintenance teams use MTBF to rank machines, to set service intervals just before the usual failure point and to test whether a change, such as better lubrication, helped. It only works for equipment that is repaired and returned to service.
Example
A diesel generator runs 960 hours in a year and fails 3 times, giving an MTBF of 320 hours. After a new fuel filter routine, it runs 1,100 hours with 2 failures, raising MTBF to 550 hours.
Records and checks
- Record running hours and every failure, with date, cause and machine ID.
- Verify hours from an hour meter if one is fitted, and use one definition of failure throughout.
- The maintenance lead calculates it; the owner reviews machines whose MTBF falls.
Common mistakes
- Treating MTBF as a guarantee that the machine will run that long without failing.
- Comparing machines of different age and duty without noting the difference.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →