Nesting

Nesting is the arrangement of part shapes on a sheet or plate so that as many parts as possible are cut from it with the least scrap.

What it means

Programmers place outlines of different parts close together, leaving space for the cut width and a small margin to the edge, and may rotate shapes to fit. Good nesting raises the usable percentage of the sheet and cuts material cost.

Example

A laser shop cuts 120 flanges and 80 brackets for one order. A good nest places all of them on three 2500 x 1250 mm sheets with 82 percent utilisation. A careless layout needs four sheets and wastes about ₹4,000 of steel.

Records and checks

  • Record the nest file name, sheet size, thickness, parts included, utilisation percentage and offcut returned to stock.
  • Verify that part counts in the nest match the order quantities, including spares.
  • The programmer prepares it, and the production planner checks the sheets issued against the nest.

Common mistakes

  • Nesting without kerf or edge margin, so parts touch and damage each other.
  • Mixing parts of different orders in one nest and losing track of which part belongs to which customer.