Non-conformance

A non-conformance is a failure to meet a specified requirement, whether in a product, a process step or a record.

What it means

The requirement may come from a drawing, a customer order, a standard or the firm's own procedure. A part outside tolerance is a non-conformance, and so is a calibration that was due and not done, or a record that is missing. Naming it triggers a defined response: contain, dispose of the goods, find the cause.

Example

During a stage check at a fastener plant, the inspector finds 300 bolts with thread length 2 mm short of the drawing. The lot is tagged and moved to a hold area, the supervisor is informed, and a decision is taken to rework 280 and scrap 20 that are beyond recovery.

Records and checks

  • Record what was found, where, the quantity, the requirement it violated and the date.
  • Verify that the affected stock is physically segregated and labelled.
  • The inspector raises it, and the quality head decides its disposal.

Common mistakes

  • Quietly reworking parts without noting them, so repeat problems never show in the data.
  • Treating non-conformances in records or procedures as less serious than product defects.