lamp.
ResourcesPricingAbout

Operation breakdown

An operation breakdown is the division of a garment into its individual sewing and finishing operations, in sequence, with the machine needed and the time for each.

What it means

A shirt may have 30 to 40 operations, such as collar run, collar turn, sleeve attach and button hole. Each operation gets a description, machine, attachment and time, often as an SMV. The list is the basis for line balancing, operator skills, costing and training. It is made from the sample garment and the buyer's specification.

Example

A polo shirt breakdown in a Bengaluru factory lists 22 operations totalling 11.5 minutes. Placket attach takes 1.1 minutes and sleeve attach 0.9, so more operators are assigned to the longer operation.

Records and checks

  • Record each operation, sequence, machine, attachment and time.
  • Verify by walking through the sample against the list and timing a few.
  • The industrial engineer prepares it; the production manager approves.

Common mistakes

  • Combining two operations in one line so the real time is hidden.
  • Copying the list from a similar style without checking the sample.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →