Outgoing quality control
Outgoing quality control is the final inspection of finished goods, their labelling and packing before they are released for dispatch to the customer.
What it means
It is the last gate. Inspectors check the product against the customer's order and specification, then check quantity, markings, documents and packing condition. They often use sampling tables for large lots. Passing the gate means that the factory stands behind the shipment; failing it holds the goods back for sorting or rework before they leave the premises.
Example
A furniture maker is dispatching 40 office chairs. The final inspector samples eight: seat height lever, castor movement, fabric stitching, and carton labels. One chair has a loose armrest screw, so all 40 are rechecked for that point, 6 are tightened, and the truck leaves a day later with the correct goods.
Records and checks
- Record the order, quantity, checks done, results, rework and the release decision with date.
- Verify that labels, quantities and documents match the customer order.
- The final inspector releases goods, and dispatch will not load without that release.
Common mistakes
- Letting dispatch pressure override a failed check on an urgent order.
- Inspecting the product but not the packing, so goods arrive damaged.