lamp.
ResourcesPricingAbout

Packing instruction

A packing instruction is a written direction on how a particular item or order must be packed, labelled and marked before it leaves for the customer.

What it means

Customers often have their own needs: a particular carton, a pallet height, bar-coded labels, no mixing of batches in one box. The packing instruction carries these needs from the order to the packing table so the packer does not rely on memory. It may be standard for a product or special for one customer, and it should override the default way of packing.

Example

A bearing dealer ships to a tractor assembler that insists on 25 pieces per box, each wrapped in VCI paper, with the part number label on two faces. The instruction is attached to every order from that buyer, and a box packed with 30 pieces is caught before loading.

Records and checks

  • Record the carton type, quantity per pack, wrap, label format, stacking limit and any special marks.
  • Verify a sample packed box against the instruction before the rest of the lot is packed.
  • The packing supervisor signs the check, and quality or dispatch does a final spot check.

Common mistakes

  • Keeping the instruction only in the salesperson's email, so the packing table never sees it.
  • Not updating it when a customer changes the carton or label, so old rules keep being followed.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →