Packing list
A packing list is a document that lists the contents of each package in a shipment, with quantities, weights and dimensions, but usually without prices.
What it means
Where an invoice says what is being charged, the packing list says what is physically in the boxes. It names each carton or pallet, the items and quantities inside, gross and net weight and measurements. The buyer uses it to check receipt, the transporter to plan loading, and for export shipments the shipping line and customs refer to it along with the invoice.
Example
A spice exporter ships 400 cartons to Dubai. The packing list shows carton numbers 1 to 400, 12 packs of 500 g in each, net weight 6 kg, gross 6.8 kg. At the port, 5 cartons are opened and matched to the list.
Records and checks
- Record carton or pallet numbers, item codes, quantity per package, net and gross weight and the invoice reference.
- Verify total cartons, quantities and weights against the invoice and the actual loaded count.
- Dispatch prepares it, and a second person checks it before the vehicle leaves.
- Check the current rule on the official portal or with your CA before acting.
Common mistakes
- Preparing the list from the order instead of from what was actually packed, so counts differ at delivery.
- Showing weights that do not match the invoice or transport documents, which invites queries at inspection.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →