lamp.
ResourcesPricingAbout

Pallet

A pallet is a flat, portable platform, usually of wood or plastic, on which goods are stacked and secured so they can be lifted and moved together.

What it means

Pallets make loading and storage faster, since a forklift or hand pallet truck handles dozens of cartons in one lift. They protect goods from floor damp and allow racking. Sizes differ by industry and country, and a pallet has a rated load limit, so heavier goods need stronger ones. Damaged or broken pallets are a safety risk and can cause crushed cartons.

Example

A juice maker stacks 48 cartons on each pallet, in 6 layers of 8, and shrink-wraps them. One forklift lift moves about 600 kg, compared with several minutes of carrying cartons by hand.

Records and checks

  • Record the number of pallets, cartons per pallet and any returnable or hired pallets sent out.
  • Verify pallet condition and load limit before stacking, and check wrap and edge guards.
  • The warehouse supervisor controls pallet stock; dispatch confirms the count at each handover.

Common mistakes

  • Overhanging cartons beyond pallet edges, which crushes boxes and unbalances stacks.
  • Not tracking returnable pallets sent to customers, so they are silently lost.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →