lamp.
ResourcesPricingAbout

Performance loss

Performance loss is the output a machine fails to make while running, because it works below its rated speed or halts for short stops that nobody logs as breakdowns.

What it means

A machine can be switched on all shift and still underperform. Slow cycles, worn tools, operator caution, material jams and one-minute stoppages all reduce pieces per hour without appearing as downtime. In overall equipment effectiveness it is the gap between actual and ideal output during run time.

Example

A packing line rated at 60 packs a minute runs for 300 minutes and delivers 15,300 packs against a possible 18,000. The shortfall of 2,700 packs, at ₹4 margin each, is ₹10,800 of lost margin in one shift.

Records and checks

  • Record the rated cycle time, run minutes and actual count for each machine every shift.
  • Verify the count against the counter, the batch record or packed cartons, not memory.
  • The line supervisor reviews short stops daily, and maintenance looks at repeat causes weekly.

Common mistakes

  • Treating slow running as normal because the line "always runs like this", so the rated speed is quietly lowered.
  • Logging every short stop under one vague reason, which makes root causes impossible to find.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →