Period comparison
Period comparison is the practice of setting the results of one period beside another period, such as this month against last month or this year against last year, to see what changed.
What it means
It turns a raw figure into a signal. Sales of ₹12 lakh mean little until you know last period was ₹10 lakh. The comparison is only fair when both periods are the same length, closed on the same basis, and cover similar conditions.
Example
A distributor compares October with September and finds sales are up 14 percent, but October had 26 working days and September had 24. Per working day, the rise is only about 5 percent, which tells a different story.
Records and checks
- Record the figures for each period, the number of working days, the cut-off date and any one-time items.
- Verify that both periods use the same accounting basis and are fully closed.
- The accountant prepares the comparison, and the owner reviews it with notes on what is unusual.
Common mistakes
- Comparing a full month with a part month, or a closed month with an open one.
- Ignoring one-off events that inflate or depress one of the periods.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →