Personal protective equipment
Personal protective equipment is gear worn by a worker, such as helmets, gloves, goggles, masks and safety shoes, to reduce exposure to a hazard that remains.
What it means
It is the last line of defence, used after the hazard has been removed, replaced or guarded as far as possible. The gear must suit the hazard, fit the person and be kept in working condition. Cotton gloves do not stop acid, and a loose mask does not stop fine dust.
Example
A chemical packing unit in Vapi issues nitrile gloves, splash goggles and rubber aprons to its 12 filling staff. The store keeps a ₹30,000 stock and replaces gloves when the supervisor sees tears or swelling.
Records and checks
- Record what was issued, to whom, the date and the replacement date.
- Verify fit, condition and use by walking the floor, not only by checking the issue register.
- The supervisor checks use daily; the safety officer audits stock and issue records.
Common mistakes
- Buying the cheapest item without checking it suits the hazard.
- Issuing once and never replacing worn gear, then blaming workers for not wearing it.
Check the current rule on the official portal or with your CA before acting.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →