lamp.
ResourcesPricingAbout

Plate thickness

Plate thickness is the measured dimension through a metal plate, normally stated in millimetres, which drives its weight, cost, strength and how it can be cut and welded.

What it means

A buyer orders plate by nominal thickness, such as 10 mm or 12 mm, but mills roll within a permitted tolerance, so the real thickness can differ slightly. Plates are sold by weight, so a small difference affects price.

Example

A fabricator buys 10 mm plate and finds it measures 9.6 mm at most points. A 2500 x 1250 mm sheet at 10 mm weighs about 245 kg, and at 9.6 mm it weighs about 235 kg, so the dispute is worth about 10 kg per sheet.

Records and checks

  • Record the nominal and measured thickness at several points on the plate and the heat number.
  • Verify with a calibrated micrometer or caliper, away from the mill scale and the cut edge.
  • The store inspector measures at receipt, and the buyer raises any shortage with the supplier in writing.

Common mistakes

  • Measuring only at one corner, which may not represent the whole plate.
  • Checking weight against the nominal thickness when the order allowed a tolerance.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →