lamp.
ResourcesPricingAbout

Portion control

Portion control is the practice of serving a fixed, standard quantity of each item so that cost per plate and the guest's experience stay consistent.

What it means

If one cook serves 200 grams of rice and another serves 260, the cost and the guest's expectation vary. A standard portion, written in the recipe, is enforced with scoops, ladles, weighing scales, pre-portioned packs and standard plates. The benefit is accurate costing, less waste and consistent satisfaction. Too small a portion hurts guest value, so the standard must be tested.

Example

A thali restaurant sets dal at 120 ml using a marked ladle, and paneer curry at 90 grams. Weighed spot checks show that over-serving by 20 grams of paneer cost ₹4 per thali, around ₹3,000 a month over 750 plates.

Records and checks

  • Record the standard portion, serving tool and weight or volume for each dish, and the spot check results.
  • Verify with random weighing during service and compare the dish's usage against sales.
  • The head chef sets the standard and the manager runs spot checks weekly.

Common mistakes

  • Setting standards on paper but not providing scoops or scales to enforce them.
  • Cutting portions to save cost without informing the menu description or price.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →