Preventive action
Preventive action is a step taken to remove the cause of a potential problem before it happens, based on early signs, risks or the lessons of problems elsewhere.
What it means
Corrective action responds to something that has already gone wrong. Preventive action looks ahead: a near miss, a trend or a known weak point gets fixed before any customer is harmed.
Example
A bakery notices that its oven door seal is wearing and temperature readings are drifting by 10 degrees. Although no batch has failed yet, the owner replaces the seal for ₹1,800 and adds a weekly calibration check, avoiding a likely loss of a whole day's biscuit batches.
Records and checks
- Record the risk or warning sign, the action decided, the owner, the date due and the date completed.
- Verify later that the warning sign has disappeared and that the action did not create a new problem.
- The operations head tracks it and the owner reviews open items monthly.
Common mistakes
- Waiting for a real failure before acting, then calling the fix preventive.
- Writing actions with no owner or date, so they stay as good intentions.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →