Process sheet
A process sheet is a document listing, in order, the operations needed to make a part, with the machine, tooling, settings, timings and inspection checks for each step.
What it means
It is the shop floor's instruction for how a product is made. For each operation it states what to do, which machine or work centre to use, the tools and fixtures, the key settings, the standard time and what to inspect. It is the source for costing, scheduling and operator training.
Example
A fabrication shop's process sheet for a bracket has five lines: cut, drill, bend, weld and paint. The bend line names the press brake, the 90° angle, 2 mm tolerance and a first-piece check.
Records and checks
- Record a revision number, date and approver on each sheet, and keep a copy at the work centre.
- Verify that the operators are using the latest revision and that the standard times match actual observation.
- The production engineer maintains it, and quality approves any change to inspection steps.
Common mistakes
- Updating the process on the floor without revising the sheet, so the paper no longer matches how the part is made.
- Leaving old revisions in circulation, so two shifts follow different instructions.