Production part approval process
The production part approval process is a way for a supplier to prove, with samples and documents, that its production method reliably makes parts meeting the customer's requirements.
What it means
Before a customer, especially in the auto industry, accepts regular supply, it asks for evidence from a real production run. The supplier submits parts with dimensional results, material and test reports, process capability data and the control plan. The customer reviews the pack and either approves, approves with conditions or rejects it. Approval says the supplier can make the part properly, not only once. It is usually repeated after major changes.
Example
A Manesar stamping company supplies a clip to a car seat maker. It runs 300 parts from production tooling, measures 5 critical dimensions on each, and submits the results with the material certificate and control plan. The customer's engineer accepts after the dimensional capability index shows above 1.33 on every key dimension.
Records and checks
- Record the submission pack, part revision, run quantity, results and the customer's decision.
- Verify that parts were made with production tools, rates and operators, not specially prepared.
- The quality head compiles it; the customer's representative approves in writing.
Common mistakes
- Submitting hand-finished samples, so the approval cannot be repeated in regular production.
- Changing a tool or material later without telling the customer, which can void the approval.