lamp.
ResourcesPricingAbout

Prototype

A prototype is an early, working model of a product, made to test its shape, fit, function and appearance before tools are made and production begins.

What it means

Prototypes catch problems when they are cheap to fix. A first model may be hand-made or 3D printed; later models get closer to the final materials and method. It lets designers, customers and the shop floor handle the thing, test it and comment. Several rounds are common. Each is judged against the requirements, and the lessons go into the next version of the drawings.

Example

A Jalandhar firm designing a new hand-held sprayer prints two plastic bodies for ₹2,800, fits bought-in pumps and tests them. The trigger is awkward for small hands and the cap leaks under pressure. These are fixed in the drawing before an injection mould costing about ₹6 lakh is ordered.

Records and checks

  • Record the prototype number, the version of drawings, materials used and the test results.
  • Verify that each requirement is tested on a prototype that resembles the final design.
  • The designer builds and tests; the sales or production lead gives feedback before the next round.

Common mistakes

  • Releasing a mould straight after a single good-looking prototype, with no functional test.
  • Changing the prototype by hand without recording the changes, so the final drawing differs from what worked.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →