Quality control
Quality control is the inspection and testing of products or processes to detect defects and make sure they meet the specified requirements.
What it means
It works on the output. Inspectors measure, test and compare against drawings or standards, and decide to accept, rework or reject. Checks happen at receipt of materials, during production and before dispatch. It finds problems that have already occurred, so it is paired with assurance, which tries to stop them from occurring.
Example
A tile maker checks every batch off the kiln for size, thickness and water absorption. On Tuesday a batch of 1,800 tiles shows 3 per cent outside the size tolerance. The batch is graded down and sold as second quality, and the kiln operator checks the pressing settings before the next batch.
Records and checks
- Record what was checked, the method, readings, the number accepted or rejected and the date.
- Verify that instruments are calibrated and operators use them correctly.
- The quality inspector reports, and the production head acts on the results.
Common mistakes
- Inspecting to sort good from bad without ever tracing why defects occur.
- Letting production approve its own rejected lots.