Rejected pieces

Rejected pieces are items that fail inspection against the drawing, specification or sample, and are held back from dispatch until they are reworked, accepted by concession or scrapped.

What it means

When a piece fails a check on size, finish, weight, appearance or function, it is rejected. The inspector marks it and moves it to a separate area, so it cannot mix with good stock. A rejection can happen in the process, at final inspection, or when a customer sends goods back. The count, defect and decision on each piece are the basis for finding the cause.

Example

A turning shop machines 500 shafts and the inspector finds 18 oversize on diameter. They are tagged red and kept in a cage. Twelve are re-machined after approval and six are scrapped as ₹90 each.

Records and checks

  • Record the quantity, defect, machine, operator and date, and the decision taken on every rejected lot.
  • Verify the physical count in the rejection area against the inspection report.
  • The quality inspector records them, and the supervisor signs the disposal or rework decision.

Common mistakes

  • Leaving rejected pieces beside good stock, so a few get packed and dispatched.
  • Scrapping pieces without a record, which hides the loss and the cause.