Repair history is the dated record of all faults, repairs, parts and costs for a particular machine over its life.

What it means

It shows what has gone wrong before, how often and what it cost. With it, a technician can spot repeating faults, a buyer can judge a machine's reliability and an owner can decide whether to keep repairing or to replace. It is only as good as the entries: a log with dates, fault descriptions, causes, parts and hours is useful, while a note saying "repaired" is not.

Example

The history of a lathe shows spindle bearing changes in March, July and November, each costing about ₹9,000 plus two days of downtime. This prompts a check of alignment, which finds the real cause.

Records and checks

  • Record date, machine ID, fault, cause, repair, parts used, hours and cost for every job.
  • Verify that the entries are completed from job cards, and that the cause field is filled.
  • The technician writes entries; the maintenance supervisor reviews the history before major decisions.

Common mistakes

  • Keeping separate logs per technician so no one sees the whole story.
  • Not recording outside repairs done by a vendor.