Responsibility matrix
A responsibility matrix is a simple table that shows which person or team is in charge of each task, process or area of the business.
What it means
It is the plain version of the idea, usually with one name per row and no further role types. It suits a small business that mainly needs to answer "who looks after this?" A RACI matrix adds more roles; this one just ends the habit of work falling between people. It works only if the names are real people with the time and authority to do the job.
Example
A 30-person plastics unit lists areas down one side: raw-material buying, quality checks, dispatch, statutory filing coordination, collections and machine maintenance. Against each it writes a single name. Collections is found to have no owner, and the accounts executive takes it.
Records and checks
- Record: task or area, owner, a backup person, the date assigned and any support team.
- Verify: that each area has one owner and nobody holds more than they can manage.
- Checked by: the owner reviews it at every operating review and when someone joins or leaves.
Common mistakes
- Naming a department rather than a person, so nobody feels answerable.
- Leaving departed staff on the matrix.