Risk assessment

A risk assessment is a structured review that identifies hazards, estimates how likely and how serious harm could be, and decides what controls are needed.

What it means

It answers three questions: what could go wrong, how bad and how likely is it, and what will we do about it. The result is a ranked list of risks with controls and owners. It should be redone when a new machine, material, process or layout is introduced, and after any serious incident. It is broader and more permanent than a task-level safety check.

Example

Before installing a new press in a 30-person tool room in Ludhiana, the owner and supervisor list trapping, noise and electrical hazards, rank trapping as the highest risk, and add a two-hand control and light curtain costing ₹85,000.

Records and checks

  • Record each hazard, who may be harmed, the rating, existing controls and extra actions.
  • Verify the actions are completed and the rating drops after they are in place.
  • The occupier or plant head approves it; workers who run the process should be consulted.

Common mistakes

  • Rating every risk as medium so nothing stands out.
  • Filing the assessment once and never updating it after layout or machine changes.