Rooftop solar

Rooftop solar is a system of solar panels mounted on a building's roof that generates electricity for the site and cuts the power bought from the utility.

What it means

It is sized in kilowatts peak, or kWp. The panels feed an inverter, and the power is used on site or exported under a net metering arrangement. It saves the most where power is used in daytime, such as factories, cold storages and shops. Costs include panels, inverter, mounting, wiring, approvals and yearly cleaning. Output varies with sun, shade, dust and temperature.

Example

A plastic unit in Vadodara installs 100 kWp on its roof for ₹48,00,000. The panels generate about 400 units a day on average. At ₹8 a unit the saving is about ₹3,200 a day, or ₹9.6 lakh a year.

Records and checks

  • Record the installed capacity, the date, inverter details, warranty papers and daily generation.
  • Verify actual output against the expected figure and clean the panels on a schedule.
  • The maintenance head watches for output drops and the owner reviews savings against the utility bill.

Common mistakes

  • Never cleaning panels, which cuts output in dusty areas.
  • Sizing the system without checking roof shade and structural strength.