Room turnaround
Room turnaround is the time and process needed to make a room ready for the next guest after check-out, covering cleaning, restocking and inspection.
What it means
Faster turnaround lets rooms be resold the same day, especially when check-outs cluster in the morning. It includes stripping beds, cleaning the bathroom, restocking toiletries, a supervisor's inspection and updating the room status to ready. Measure the minutes from check-out to ready. Rushing causes missed spots that guests notice at once.
Example
A 30-room business hotel finds that average turnaround is 45 minutes, but check-outs bunch at 11 am and early arrivals wait at noon. It adds a second cleaner for that window, so the first rooms are ready by 12:30 pm.
Records and checks
- Record check-out time, cleaning start, inspection time and ready time for each room.
- Verify each room against a checklist covering linen, bathroom and amenities before it is marked ready.
- The housekeeping supervisor inspects each room, and the manager reviews average turnaround weekly.
Common mistakes
- Marking a room ready in the register before inspection, so the guest finds it unfinished.
- Tracking only the average, which hides the slow rooms such as suites or upper floors.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →