Root cause of breakdown
The root cause of a breakdown is the underlying reason the failure happened, which, if corrected, would prevent the same failure from recurring.
What it means
The visible failure is often a symptom. A burnt motor may be the symptom, while the cause is a blocked ventilation grille, overloading or a poor power supply. A simple way to dig is to ask "why" repeatedly until reaching something that can be fixed in the process, such as a missing cleaning step. Fixing only the symptom brings the breakdown back a few weeks later.
Example
A conveyor belt snaps three times in a year. Each replacement costs ₹5,000. Investigation finds the take-up roller is misaligned, so the belt rubs one edge. Aligning it ends the failures.
Records and checks
- Record the failure, the whys asked, the root cause found and the corrective action and its date.
- Verify afterwards that the fault has not recurred over a reasonable period.
- The supervisor leads the analysis with the operator and technician; the maintenance head reviews major cases.
Common mistakes
- Blaming the operator at the first why, without checking the equipment and procedure.
- Recording the part replaced as the cause.