Round bar
Round bar is solid, circular-section metal stock, ordered by diameter and length, used for shafts, pins, studs and other turned or fabricated parts.
What it means
It is made in mild steel, alloy steel, stainless steel and other metals, in bright drawn or hot rolled finishes. Bright bar has tighter diameter tolerance and a cleaner surface, so it is common where parts are turned or ground afterwards. For mild steel, weight in kg per metre can be estimated as diameter in mm squared divided by 162.
Example
A shop needs 120 m of 20 mm mild steel round bar. At 20 x 20 divided by 162, each metre weighs about 2.47 kg, so the order is about 296 kg. At ₹68 per kg, the material costs about ₹20,100.
Records and checks
- Record the diameter, finish, grade, length, heat number, weight and supplier invoice.
- Verify the diameter with a micrometer at receipt and the weight on a calibrated scale.
- The store keeper checks and the quality inspector reviews mill certificates where the job needs them.
Common mistakes
- Ordering hot rolled bar for a part that needs close diameter tolerance, so machining stock runs short.
- Cutting bars to length with no allowance for facing and kerf.
Did not find your answer?Message the lamp team on WhatsApp. Ask about setup, your records, or anything we have not covered here.Ask us on WhatsApp →