Safe work method statement

A safe work method statement is a written plan for carrying out a high-risk job safely, listing its steps, hazards, controls, equipment, permits and responsible people.

What it means

It is common in construction, maintenance and contractor jobs, where the work is done by outside crews who do not know the site. The document describes how the job will be done in sequence, who supervises, what protective gear and permits are needed and what to do in an emergency. It is read to the crew before they start, and they sign to show they understood it.

Example

A contractor is hired for ₹1.8 lakh to repaint a factory roof in Nagpur. The method statement sets out harness anchor points, edge protection, weather limits, a two-person rescue plan and the permit needed from the plant head.

Records and checks

  • Record the job steps, hazards, controls, permits, crew names and signatures.
  • Verify the contractor's actual set up on site matches what the statement says.
  • The site owner's safety officer approves it before work begins and spot checks during the job.

Common mistakes

  • Accepting a generic statement copied from another site without reading it.
  • Approving it on paper and never visiting the job once it starts.